A tariff announcement can change a material price faster than an estimate can be reviewed. That does not mean estimators are helpless. It means the estimate needs a clear record of when each price was set, how long it holds, and who carries the risk when it moves. This post covers how to do that in practice.
What has been happening
The Associated General Contractors reported that inputs to new nonresidential construction rose 8.9% from August 2025 to August 2026, and its October release put the September figure at 11.9%. AGC tied the increases to conflict in the Middle East and steep tariffs on key materials. Metals and fuel led, and the increases have since spread to other goods. The detailed numbers are in our 2026 material cost update.
For an estimator, the useful point is not the headline. It is that prices are changing during the bid and buyout period, so an estimate built on a single date is only as good as the time it takes to reach the buyer.
Quote validity is the first control
Every material and subcontract quote has a date and a validity period, and the period has been shrinking for volatile products. One Texas contractor’s Q4 2025 supply chain report, for example, noted that reinforcing steel suppliers were limiting price validity to about ten days because of tariff impacts. That is one contractor’s market report from late 2025, not a rule, but it shows the pattern. If your bid is open for 60 days and your quote holds for ten, the gap is a risk someone has to carry.
Record the quote date and validity next to each major price. Where validity is shorter than the bid period, either get an extension, carry an allowance for the gap, or state that the price is subject to adjustment.
Escalation, and how it differs from contingency
Escalation is the expected rise in price between the date of the estimate and the date of purchase or installation. It is a forecast with a direction, so it is calculated. Contingency covers unknowns and is a different thing, discussed in the contingency guide. Mixing them hides both.
A simple escalation calculation: cost x (1 + annual rate) raised to the number of years from price date to the midpoint of purchase. If a price is dated now and the material will be bought in about eight months, and you assume a 6% annual rate, escalation is roughly 1.06 raised to the power of 0.67, close to 4%. The rate is an assumption you must support, so use a current index for the material category and the reasoning behind it. Do not apply one percentage to everything. Steel, copper and electrical gear have behaved differently from lumber or masonry.
Handling the risk in the bid
Estimators have a few tools. Alternates let the owner choose a price-sensitive option, such as a different material, and see the cost difference. Allowances carry a fixed amount for an item whose price is uncertain, with the difference adjusted later. Exclusions and qualifications can say that pricing is based on quotes dated on a stated day, and that increases after that date are handled by change order. Contract terms may also include price-adjustment clauses, if the owner will accept them. The right mix depends on the contract type, and public work often limits what you can qualify.
Documenting what you assumed
When a price jumps after a bid, the question becomes what the estimate assumed. A good file shows the quote date, validity period, escalation rate and its basis, items excluded and allowances carried. This is also what makes a later change order defensible. The same documentation habit shows up in our list of common estimating mistakes.
Specific materials
Steel and copper deserve their own treatment. Steel has both price and lead-time exposure, so read it alongside long-lead equipment planning and the steel estimating guide. Copper drives cable, busway and many electrical items, which is why it matters to electrical estimates.
Common questions
How do tariffs affect construction estimates?
They raise material prices and make them less stable, so estimates need dated quotes, escalation where appropriate and clear assumptions about who bears later increases.
Should I add a percentage for tariffs?
Not as a blanket number. Apply escalation to the materials that are exposed, with a basis you can explain.
What is the difference between escalation and contingency?
Escalation is a forecast of price change over time. Contingency is an allowance for unknown events and scope risk.
Estimates with current pricing
Our cost estimation service prices work against current quotes and records the assumptions. If you only need the measured quantities to price yourself, see quantity and material takeoffs, or get in touch about a project.